Installation of large-diameter sensors
Because large-diameter pipelines are buried in the ground on most occasions, a cement pit should be made before the installation of large-diameter sensors. Figure 6-19 shows a common installation form in the water supply and drainage system. The concrete pit should have enough space for movement. The side walls are buried with steel pipes for […]
Installation of large-diameter sensors Read More »