Magnetic flow meter flow tube requirements

Magnetic flow meter

Straight pipe: upstream≥5D, downstream≥3D. Insertion type entrance ≥10D, exit ≥5D

Valve:  Flowmeter installed behind the valve, flow meter upstream ≥10, Downstream≥5D

Front of right-angle turn: Upstream ≥10, Downstream≥5D

Behind of right-angle turn: Upstream ≥10, Downstream≥5D

Horizontal installation: The inner diameter of the pipe should be the same as the inner diameter of the sensor.

Vertical installation: The flow direction of the fluid is from bottom to top, and the sensor cannot be installed at the highest position of the pipeline to prevent the accumulation of bubbles.

 