Grounding seems like one of the simplest parts of an instrumentation installation—until someone asks a surprisingly difficult question:
Can multiple field instruments share a series grounding connection, or must every instrument be grounded individually?
In practice, this question can lead to disagreement among instrument engineers, electrical engineers, contractors, inspectors, and commissioning teams.
A particularly interesting example can be found in Chinese petrochemical instrumentation standards.
SH/T 3551-2024, Specification for Construction and Acceptance of Instrumentation Engineering in Petrochemical Industry, states that each instrument or device requiring grounding should be grounded individually and should not be connected in series.
However, SH/T 3081-2025, Design Specification for Instrument Grounding in Petrochemical Industry, allows certain instruments, junction boxes, supports, conduits, and other metallic objects to be connected in series under specified conditions. For instruments, the recommended number connected in series is limited.
At first glance, these requirements appear contradictory.
But the real issue is more complicated than simply asking:
“Is series grounding allowed or prohibited?”
To understand the answer, we first need to distinguish grounding, bonding, equipment type, installation conditions, and the scope of the applicable standard.
1. Why Instrument Grounding Causes So Much Confusion
Grounding requirements are intended to achieve several objectives:
- Protect personnel against electric shock
- Provide a reliable path for fault current
- Maintain equipotential bonding
- Reduce unwanted electrical interference
- Improve EMC performance
- Provide appropriate reference potentials for instrumentation systems
The problem is that not every grounding conductor performs exactly the same function.
A protective earth conductor for electrical safety is not necessarily equivalent to an instrument signal reference conductor.
Likewise, connecting two metallic instrument housings together is not always the same engineering concept as daisy-chaining protective earth conductors between electrical equipment.
This distinction becomes especially important in industrial plants where field instruments are already mechanically connected to grounded metallic structures.
2. Grounding and Bonding Are Not Exactly the Same Thing
One of the most common sources of confusion is treating grounding and bonding as interchangeable terms.
Grounding
Grounding connects equipment or an electrical system to the plant grounding system or earth reference.
Depending on the application, its purpose may include:
- Personnel protection
- Fault-current discharge
- Electrical reference
- Lightning protection
- Static electricity dissipation
Bonding
Bonding electrically connects conductive objects so that dangerous potential differences do not develop between them.
For example, a field transmitter may be mounted on:
- A metallic bracket
- A steel pipe
- A metallic instrument stand
- A cable tray
- A grounded structural steel member
If these components form a reliable low-resistance conductive path, the instrument housing may already participate in the plant’s equipotential bonding network.
This is why simply counting the number of grounding wires does not always tell us whether an installation is electrically safe.
3. Why Daisy-Chained Grounding Is Often Prohibited
There is a very good reason why many electrical installation practices discourage or prohibit daisy-chained protective grounding.
Consider three devices connected like this:
Grounding Bar → Device A → Device B → Device C
If the connection at Device A becomes loose, corroded, damaged, or accidentally removed, Devices B and C may simultaneously lose their intended grounding path.
By comparison:
Device A → Grounding Bar
Device B → Grounding Bar
Device C → Grounding Bar
provides independent grounding paths.
A failure in one branch is less likely to affect the others.
This is the fundamental reason that individual grounding is generally the more conservative arrangement, particularly for equipment where protective earthing is safety-critical.
4. Why Some Instrumentation Standards Allow Limited Series Connections
Field instrumentation presents some situations that are different from conventional electrical equipment.
A transmitter installed on a steel structure may already have several conductive paths through:
Instrument Housing → Mounting Bracket → Steel Structure → Plant Grounding Network
Similarly, metallic conduit, instrument supports, junction boxes, and other conductive components may form part of an equipotential bonding system.
This engineering reality is reflected in SH/T 3081-2025.
The standard permits certain field instruments and metallic components to be connected in series under defined conditions and recommends limiting the number of instruments connected in series.
This should not be interpreted as:
“Daisy-chained grounding is always acceptable.”
A better interpretation is:
Under an applicable design standard, limited series bonding or grounding arrangements may be acceptable when electrical continuity and equipotential bonding are reliably maintained.
The distinction is important.
5. SH/T 3551-2024 vs. SH/T 3081-2025: Why Do They Appear Different?
The two standards approach the issue from different engineering perspectives.
SH/T 3551-2024: Construction and Acceptance
A construction and acceptance specification focuses heavily on:
How should the installation be constructed and accepted on site?
Requiring individual grounding is easy to inspect, easy to document, and reduces uncertainty during construction.
It also minimizes the possibility that disconnecting one piece of equipment will unintentionally interrupt the grounding continuity of another.
SH/T 3081-2025: Grounding Design
A grounding design specification addresses another question:
How should an instrumentation grounding system be designed based on actual engineering conditions?
From a design perspective, metallic supports, structural steel, conduits, equipment housings, and grounding conductors may all contribute to an equipotential bonding network.
This allows designers to consider whether additional grounding conductors actually improve electrical safety and grounding performance.
Therefore, the apparent difference between the two standards should not automatically be interpreted as one standard being “right” and the other being “wrong.”
Their scope and engineering purpose need to be considered.
6. Field Instruments and Control Cabinets Should Not Be Treated the Same Way
This distinction is extremely important.
A limited series connection between certain field instruments should not be generalized to control cabinets, PLC cabinets, DCS cabinets, marshalling cabinets, or other major electrical and control-system equipment.
For control-system cabinets, independent and reliable grounding connections are generally required according to the applicable project design and grounding requirements.
Why?
Because cabinets may contain:
- AC power circuits
- DC power distribution
- I/O modules
- Communication equipment
- Surge protection devices
- Intrinsically safe barriers
- Signal grounding systems
- Sensitive electronic equipment
A poor grounding connection at a cabinet can therefore affect considerably more equipment than a single field transmitter.
Do not use a field-instrument grounding exception as justification for daisy-chaining control cabinets.
7. Can a Metal Support Provide the Grounding or Bonding Path?
Under appropriate design conditions, a metallic mounting structure may provide a reliable conductive connection.
For example:
Field Instrument → Metal Bracket → Grounded Steel Structure
may already provide electrical continuity.
But there is an important condition:
Mechanical contact does not automatically guarantee good electrical contact.
Potential problems include:
- Paint
- Rust
- Corrosion
- Insulating coatings
- Gaskets
- Loose bolts
- Contaminated contact surfaces
- Dissimilar-metal corrosion
A transmitter may appear to be securely attached to a steel structure while still having poor electrical continuity.
Therefore, when a metallic support is intended to form part of the bonding path, the conductive connection should be deliberately designed and verified rather than simply assumed.
8. Electrical Continuity Matters More Than the Appearance of the Grounding Wire
A grounding conductor that looks correct does not necessarily provide a good grounding connection.
Important factors include:
- Conductor cross-sectional area
- Terminal condition
- Contact resistance
- Mechanical security
- Corrosion protection
- Electrical continuity
- Connection to the plant grounding network
This is why measurement is important during inspection and commissioning.
For installations designed according to SH/T 3081-2025, the relevant resistance and continuity requirements specified by that standard should be verified.
For example, where the cited standard requires a grounding connection resistance of no more than 1 Ω, this requirement should be confirmed by measurement rather than visual inspection alone.
Note that this value is associated with the cited SH/T requirements and should not automatically be treated as a universal limit for every industrial installation worldwide.
9. What About the “Maximum Three Instruments” Rule?
SH/T 3081-2025 recommends limiting the number of instruments in the applicable series arrangement to no more than three.
This is useful guidance within the scope of that standard.
However, engineers working on international projects should be careful not to convert this into a universal rule such as:
“Three instruments can always be grounded in series.”
That would be incorrect.
Whether such an arrangement is acceptable depends on factors including:
- Applicable national standards
- Project specifications
- Instrument type
- Hazardous-area classification
- Protective earthing requirements
- Grounding-system design
- Manufacturer instructions
- Electrical continuity
- Inspection and acceptance requirements
The project grounding philosophy and approved engineering drawings should ultimately define the installation method.
10. What Should You Do When Different Standards Appear to Conflict?
Avoid making the decision based on a single sentence taken from one standard.
Instead, check the requirements systematically.
Step 1 — Identify the equipment
Is it:
- A field transmitter?
- Junction box?
- Instrument support?
- Analyzer?
- Control cabinet?
- Electrical equipment?
Different equipment may have different grounding requirements.
Step 2 — Identify the grounding function
Determine whether the connection is intended for:
- Protective earthing
- Equipotential bonding
- Instrument reference grounding
- Signal shielding
- Intrinsic-safety grounding
- Static protection
- Lightning protection
These functions should not be casually mixed.
Step 3 — Check the applicable standards
Determine which national, industry, and project standards govern the installation.
Step 4 — Check the approved design
Review:
- Grounding drawings
- Instrument installation details
- Project specifications
- Vendor documentation
- Hazardous-area requirements
Step 5 — Verify electrical continuity
Do not rely only on visual inspection.
Measure the required resistance and continuity according to the applicable project or standard requirements.
Step 6 — Document the results
Keep inspection and test records.
When questions arise during commissioning or third-party inspection, measured results and approved engineering documents are far more useful than arguing about individual sentences from different standards.
11. Common Instrument Grounding Mistakes
Regardless of whether series connections are permitted on a particular project, several common practices should be avoided.
Mistake 1: Assuming Every Metal Connection Is Electrically Reliable
Bolted mechanical contact does not necessarily guarantee a low-resistance electrical connection.
Mistake 2: Treating Protective Earth and Signal Ground as the Same System
They may serve different purposes and should follow the project’s grounding philosophy.
Mistake 3: Daisy-Chaining Control Cabinets Because Field Instruments Allow It
The requirements are not interchangeable.
Mistake 4: Ignoring Paint and Corrosion
A steel bracket is useful as part of an equipotential bonding path only when electrical continuity is actually maintained.
Mistake 5: Copying One Standard’s Resistance Limit Into Every Project
Grounding requirements must be evaluated according to the applicable standards and project specifications.
Mistake 6: Disconnecting Grounding Conductors During Maintenance Without Considering Downstream Equipment
If an approved series arrangement is used, maintenance personnel must understand whether removing one connection could interrupt electrical continuity for other equipment.
12. A Practical Field Checklist
Before accepting an instrument grounding installation, check:
- Is the grounding arrangement consistent with the approved design?
- Is the equipment correctly classified as a field instrument, cabinet, junction box, or electrical device?
- Is protective earthing being confused with bonding or signal grounding?
- Are grounding terminals mechanically secure?
- Are conductive contact surfaces free from insulating paint or excessive corrosion where required?
- Is the conductor correctly sized?
- Could removing one instrument interrupt the grounding path of another?
- Has grounding continuity been measured?
- Are the measured resistance values within the applicable project requirements?
- Have the inspection and test results been recorded?
- Are hazardous-area requirements satisfied?
- Are manufacturer grounding instructions being followed?
A grounding system should be judged by its electrical function, reliability, compliance, and continuity, not simply by how many green/yellow wires are visible.
Final Thoughts
So, can field instruments be grounded in series?
There is no universal yes-or-no answer.
Individual grounding remains the more conservative arrangement and is required in many installations. However, certain instrumentation design standards, including the cited SH/T 3081-2025 provisions, recognize that limited series connections or reliable metallic bonding paths may be acceptable under specified conditions.
The key engineering principle is not to minimize the number of grounding wires.
It is to ensure:
Reliable equipotential bonding, electrical continuity, an appropriate fault-current path, and compliance with the applicable design and standards.
For international projects, engineers should never assume that a requirement from one national or industry standard automatically applies everywhere. Always check the project’s approved grounding philosophy, local regulations, hazardous-area requirements, and equipment manufacturer’s instructions.
In instrumentation engineering, good grounding is not about adding as many wires as possible.
It is about making sure every required conductive path remains reliable when it matters.